methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Visual Management workspace showing the question, observations, and next decision.
Operations
Visual Management
Paper illustration for PDCA Cycle.
Operations
PDCA Cycle
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration for Kaizen Event.
Operations
Kaizen Event
Purposedifferent
With high tempo and many parallel topics, the method makes status, deviations, and priorities visible at a glance. It reduces search effort and prevents what matters from getting lost in daily work.For an improvement that still has to prove itself in everyday work, the method runs it through small learning loops. It connects planning, checking, and standardization into a repeatable learning mode.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments.
Complexitydifferent
LowLowHighMedium
Timedifferent
Ongoing1 h bis mehrere WochenSeveral meetings plus preparation and analysis; total effort depends on scope0.5-5 Tage
Participantsdifferent
1-201-8Evaluation team, architects, and relevant stakeholders4-10
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Visual Board, Status Indicators, Exception CuesPDCA Log, Experiment Plan, Learning Outcome, Standard ChangePrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsKaizen Charter, Waste List, Improvement Experiments, Standard Work Update
Tagsno overlap
SignalsOperationsVisual management
Continuous improvementLeanExperiments
ArchitectureQualityRiskTradeoffsStakeholders
LeanContinuous improvementOperations
Add more methods