methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Visual Management workspace showing the question, observations, and next decision.
Operations
Visual Management
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Purposedifferent
With high tempo and many parallel topics, the method makes status, deviations, and priorities visible at a glance. It reduces search effort and prevents what matters from getting lost in daily work.For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.
Complexitydifferent
LowHighLowLow
Timedifferent
Ongoing2-8 h15-45 min15-30 min
Participantsdifferent
1-202-81-32-6
Formatdifferent
Workshop + asyncWorkshop + asyncAsyncWorkshop
Outputdifferent
Visual Board, Status Indicators, Exception CuesProblem Analysis, Decision Analysis, Risk PlanADR File, Decision Log, RationaleRoot cause notes, Countermeasures
Tagsno overlap
SignalsOperationsVisual management
Problem solvingRoot causeDecisionOperations
ArchitectureRationaleDocumentationGovernance
Root causeIncidentLeanProblem solving
Add more methods