methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Visual Management workspace showing the question, observations, and next decision.
Operations
Visual Management
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Paper illustration for Theory of Constraints.
Operations
Theory of Constraints
Purposedifferent
With high tempo and many parallel topics, the method makes status, deviations, and priorities visible at a glance. It reduces search effort and prevents what matters from getting lost in daily work.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.For a system that does not get faster despite effort, the method directs attention to the bottleneck. It concentrates improvement on the point that actually limits throughput.
Complexitydifferent
LowMediumMediumHigh
Timedifferent
OngoingOngoing10-30 min je Item2-4 h Analyse, laufend
Participantsdifferent
1-202-121-83-12
Formatsame
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Visual Board, Status Indicators, Exception CuesKanban board, WIP policies, Flow metricsThree-Point Estimate, Risk Range, Assumption NotesConstraint Map, Improvement Plan, Flow Metrics
Tagsno overlap
SignalsOperationsVisual management
FlowVisual managementDelivery
EstimationUncertaintyForecasting
OperationsConstraintsFlowImprovement
Add more methods