methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Visual Management workspace showing the question, observations, and next decision.
Operations
Visual Management
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Theory of Constraints.
Operations
Theory of Constraints
Process Mapping method illustration showing its working structure
Operations
Process Mapping
Purposedifferent
With high tempo and many parallel topics, the method makes status, deviations, and priorities visible at a glance. It reduces search effort and prevents what matters from getting lost in daily work.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.For a system that does not get faster despite effort, the method directs attention to the bottleneck. It concentrates improvement on the point that actually limits throughput.With a confusing workflow that has many handoffs, the method makes the actual process visible. It shows where work is passed on, delayed, or duplicated, so improvement targets the right spots.
Complexitydifferent
LowMediumHighMedium
Timedifferent
OngoingOngoing2-4 h Analyse, laufend1-3 h
Participantsdifferent
1-202-123-123-10
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Visual Board, Status Indicators, Exception CuesKanban board, WIP policies, Flow metricsConstraint Map, Improvement Plan, Flow MetricsProcess Map, Handoff List, Improvement Backlog
Tagsno overlap
SignalsOperationsVisual management
FlowVisual managementDelivery
OperationsConstraintsFlowImprovement
ProcessOperationsImprovement
Add more methods