methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Visual Management workspace showing the question, observations, and next decision.
Operations
Visual Management
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Purposedifferent
With high tempo and many parallel topics, the method makes status, deviations, and priorities visible at a glance. It reduces search effort and prevents what matters from getting lost in daily work.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.
Complexitydifferent
LowMediumHighLow
Timedifferent
OngoingOngoing2-8 h15-30 min
Participantsdifferent
1-202-122-82-6
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Visual Board, Status Indicators, Exception CuesKanban board, WIP policies, Flow metricsProblem Analysis, Decision Analysis, Risk PlanRoot cause notes, Countermeasures
Tagsno overlap
SignalsOperationsVisual management
FlowVisual managementDelivery
Problem solvingRoot causeDecisionOperations
Root causeIncidentLeanProblem solving
Add more methods