methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Visual Management workspace showing the question, observations, and next decision.
Operations
Visual Management
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration of DIBB with its method-specific working model.
Product Strategy
DIBB
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Purposedifferent
With high tempo and many parallel topics, the method makes status, deviations, and priorities visible at a glance. It reduces search effort and prevents what matters from getting lost in daily work.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.DIBB helps clarify target groups, value, goals, and priorities by making the logic behind a decision explicit. It captures results as a DIBB document, belief list, bet list, and learning report.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.
Complexitydifferent
LowMediumLowHigh
Timedifferent
OngoingOngoing1-2 h90-180 min
Participantsdifferent
1-202-122-83-8
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Visual Board, Status Indicators, Exception CuesKanban board, WIP policies, Flow metricsDIBB document, Belief list, Bet list, Learning reportCoD Table, Prioritization Sequence
Tagsno overlap
SignalsOperationsVisual management
FlowVisual managementDelivery
StrategyDecisionAssumptionsHypothesis
PrioritizationDeliveryEconomicsDecision
Add more methods