methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Visual Management workspace showing the question, observations, and next decision.
Operations
Visual Management
Paper illustration for Kaizen Event.
Operations
Kaizen Event
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Purposedifferent
With high tempo and many parallel topics, the method makes status, deviations, and priorities visible at a glance. It reduces search effort and prevents what matters from getting lost in daily work.For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments.When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.
Complexitydifferent
LowMediumLowLow
Timedifferent
Ongoing0.5-5 Tage60-90 min15-30 min
Participantsdifferent
1-204-104-102-6
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop
Outputdifferent
Visual Board, Status Indicators, Exception CuesKaizen Charter, Waste List, Improvement Experiments, Standard Work UpdateProblem Cluster, Prioritized Challenge, ExperimentRoot cause notes, Countermeasures
Tagsno overlap
SignalsOperationsVisual management
LeanContinuous improvementOperations
FacilitationDecisionProblem solvingWorkshop
Root causeIncidentLeanProblem solving
Add more methods