methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Visual Management workspace showing the question, observations, and next decision.
Operations
Visual Management
Paper illustration for Intervention Mapping.
Systems Thinking
Intervention Mapping
A paper-based illustration representing C4 Model with its core stages and visible working result.
Architecture
C4 Model
Paper illustration of Futures Wheel with its method-specific working model.
Systems Thinking
Futures Wheel
Purposedifferent
With high tempo and many parallel topics, the method makes status, deviations, and priorities visible at a glance. It reduces search effort and prevents what matters from getting lost in daily work.Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain.The C4 Model makes a system legible across several resolution levels, from context down to code. It suits situations where different audiences need to understand the same architecture from different altitudes.The Futures Wheel helps explore the consequences of a decision, a trend, or a strategic move in a structured way. It makes visible which first, second, and third-order effects could arise from an event.
Complexitydifferent
LowHighLowMedium
Timedifferent
Ongoing1-5 Tage1-4 h60-120 min
Participantsdifferent
1-204-121-53-10
Formatsame
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Visual Board, Status Indicators, Exception CuesLogic Model, Change Objectives, Intervention Components, Evaluation PlanContext Diagram, Container Diagram, Component DiagramFutures Wheel, Consequence Chains, Strategic Signals
Tagsno overlap
SignalsOperationsVisual management
ChangeSystems thinkingCapability
ArchitectureCommunicationVisualization
ForesightSystems thinkingSignals
Add more methods