View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Visual Management | ![]() Product Discovery Fake Door Test | ![]() Operations Kaizen Event | ![]() Operations PDCA Cycle |
|---|---|---|---|---|
Purposedifferent | With high tempo and many parallel topics, the method makes status, deviations, and priorities visible at a glance. It reduces search effort and prevents what matters from getting lost in daily work. | When demand is still unclear, it measures interest in a feature before it is built. It separates real behavior from polite agreement and deliberately keeps build effort small. | For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments. | For an improvement that still has to prove itself in everyday work, the method runs it through small learning loops. It connects planning, checking, and standardization into a repeatable learning mode. |
Complexitydifferent | Low | Medium | Medium | Low |
Timedifferent | Ongoing | 1-5 Tage | 0.5-5 Tage | 1 h bis mehrere Wochen |
Participantsdifferent | 1-20 | Nutzertraffic | 4-10 | 1-8 |
Formatdifferent | Workshop + async | Async | Workshop | Workshop + async |
Outputdifferent | Visual Board, Status Indicators, Exception Cues | Click Data, Interest Signal, Learning Decision | Kaizen Charter, Waste List, Improvement Experiments, Standard Work Update | PDCA Log, Experiment Plan, Learning Outcome, Standard Change |
Tagsno overlap | SignalsOperationsVisual management | ValidationExperimentsDemandDiscovery | LeanContinuous improvementOperations | Continuous improvementLeanExperiments |



