methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Visual Management workspace showing the question, observations, and next decision.
Operations
Visual Management
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
Purposedifferent
With high tempo and many parallel topics, the method makes status, deviations, and priorities visible at a glance. It reduces search effort and prevents what matters from getting lost in daily work.When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.
Complexitydifferent
LowLowLowHigh
Timedifferent
Ongoing60-90 min15-30 min2-8 h
Participantsdifferent
1-204-102-62-8
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop + async
Outputdifferent
Visual Board, Status Indicators, Exception CuesProblem Cluster, Prioritized Challenge, ExperimentRoot cause notes, CountermeasuresProblem Analysis, Decision Analysis, Risk Plan
Tagsno overlap
SignalsOperationsVisual management
FacilitationDecisionProblem solvingWorkshop
Root causeIncidentLeanProblem solving
Problem solvingRoot causeDecisionOperations
Add more methods