methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Visual Management workspace showing the question, observations, and next decision.
Operations
Visual Management
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
Purposedifferent
With high tempo and many parallel topics, the method makes status, deviations, and priorities visible at a glance. It reduces search effort and prevents what matters from getting lost in daily work.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.
Complexitydifferent
LowHighMediumHigh
Timedifferent
Ongoing90-180 minOngoing2-8 h
Participantsdifferent
1-203-82-122-8
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
Visual Board, Status Indicators, Exception CuesCoD Table, Prioritization SequenceKanban board, WIP policies, Flow metricsProblem Analysis, Decision Analysis, Risk Plan
Tagsno overlap
SignalsOperationsVisual management
PrioritizationDeliveryEconomicsDecision
FlowVisual managementDelivery
Problem solvingRoot causeDecisionOperations
Add more methods