methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Visual Management workspace showing the question, observations, and next decision.
Operations
Visual Management
A paper-based illustration representing C4 Model with its core stages and visible working result.
Architecture
C4 Model
Paper illustration for ALPEN Method
Operations
ALPEN Method
A paper-based illustration representing arc42 with its core stages and visible working result.
Architecture
arc42
Purposedifferent
With high tempo and many parallel topics, the method makes status, deviations, and priorities visible at a glance. It reduces search effort and prevents what matters from getting lost in daily work.The C4 Model makes a system legible across several resolution levels, from context down to code. It suits situations where different audiences need to understand the same architecture from different altitudes.With an overloaded day full of too many tasks, a realistic picture of the day emerges. The method connects estimating, deciding, and buffer thinking so planning fits available energy and time.arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes.
Complexitysame
LowLowLowLow
Timedifferent
Ongoing1-4 h10-20 min daily1-2 Tage
Participantsdifferent
1-201-511-4
Formatdifferent
Workshop + asyncWorkshop + asyncAsyncWorkshop + async
Outputdifferent
Visual Board, Status Indicators, Exception CuesContext Diagram, Container Diagram, Component DiagramDaily Plan, Time Estimates, Review NotesArchitecture Document, Context View, Runtime View, Deployment View
Tagsno overlap
SignalsOperationsVisual management
ArchitectureCommunicationVisualization
PlanningTime managementProductivityOperations
ArchitectureDocumentationCommunication
Add more methods