methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Visual Management workspace showing the question, observations, and next decision.
Operations
Visual Management
Paper illustration for ABC Analysis
Operations
ABC Analysis
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Theory of Constraints.
Operations
Theory of Constraints
Purposedifferent
With high tempo and many parallel topics, the method makes status, deviations, and priorities visible at a glance. It reduces search effort and prevents what matters from getting lost in daily work.With many similar objects of differing economic significance, the method prioritizes effort by effect. It separates what needs regular steering from what rarely needs attention.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.For a system that does not get faster despite effort, the method directs attention to the bottleneck. It concentrates improvement on the point that actually limits throughput.
Complexitydifferent
LowLowMediumHigh
Timedifferent
Ongoing30-60 minOngoing2-4 h Analyse, laufend
Participantsdifferent
1-201-52-123-12
Formatdifferent
Workshop + asyncAsyncWorkshop + asyncWorkshop + async
Outputdifferent
Visual Board, Status Indicators, Exception CuesABC Classification, Focus Rules, Control ListKanban board, WIP policies, Flow metricsConstraint Map, Improvement Plan, Flow Metrics
Tagsno overlap
SignalsOperationsVisual management
PrioritizationOperationsPortfolio
FlowVisual managementDelivery
OperationsConstraintsFlowImprovement
Add more methods