methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Value Stream Mapping workspace showing the question, observations, and next decision.
Delivery
Value Stream Mapping
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Paper illustration for ABC Analysis
Operations
ABC Analysis
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Purposedifferent
When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible.When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.With many similar objects of differing economic significance, the method prioritizes effort by effect. It separates what needs regular steering from what rarely needs attention.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.
Complexitydifferent
MediumHighLowHigh
Timedifferent
1-3 h45-90 min30-60 min90-180 min
Participantsdifferent
4-103-101-53-8
Formatdifferent
WorkshopWorkshopAsyncWorkshop
Outputdifferent
Current-state map, Future-state map, Bottleneck listRanked Backlog, Cost-of-Delay AssumptionsABC Classification, Focus Rules, Control ListCoD Table, Prioritization Sequence
Tagsno overlap
LeanFlowWasteDelivery
LeanEconomicsSequencePrioritization
PrioritizationOperationsPortfolio
PrioritizationDeliveryEconomicsDecision
Add more methods