methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Value Stream Mapping workspace showing the question, observations, and next decision.
Delivery
Value Stream Mapping
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Purposedifferent
When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible.A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.
Complexitydifferent
MediumMediumHighMedium
Timedifferent
1-3 h10-30 min je Item45-90 minOngoing
Participantsdifferent
4-101-83-102-12
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Current-state map, Future-state map, Bottleneck listThree-Point Estimate, Risk Range, Assumption NotesRanked Backlog, Cost-of-Delay AssumptionsKanban board, WIP policies, Flow metrics
Tagsno overlap
LeanFlowWasteDelivery
EstimationUncertaintyForecasting
LeanEconomicsSequencePrioritization
FlowVisual managementDelivery
Add more methods