methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Value Stream Mapping workspace showing the question, observations, and next decision.
Delivery
Value Stream Mapping
Paper illustration of Leverage Points with its method-specific working model.
Systems Thinking
Leverage Points
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Purposedifferent
When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible.Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.
Complexitydifferent
MediumHighHighHigh
Timedifferent
1-3 hHalf day90-180 min45-90 min
Participantsdifferent
4-103-123-83-10
Formatsame
WorkshopWorkshopWorkshopWorkshop
Outputdifferent
Current-state map, Future-state map, Bottleneck listLeverage Map, Action StrategyCoD Table, Prioritization SequenceRanked Backlog, Cost-of-Delay Assumptions
Tagsno overlap
LeanFlowWasteDelivery
Systems thinkingChangeStrategy
PrioritizationDeliveryEconomicsDecision
LeanEconomicsSequencePrioritization
Add more methods