methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Value Stream Mapping workspace showing the question, observations, and next decision.
Delivery
Value Stream Mapping
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Current Reality Tree
Systems Thinking
Current Reality Tree
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Purposedifferent
When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.A Current Reality Tree condenses many symptoms into a few causal chains. The method makes visible which core problems drive several negative effects at once.For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.
Complexitydifferent
MediumMediumHighMedium
Timedifferent
1-3 hOngoing2-6 h1-3 h
Participantsdifferent
4-102-123-83-8
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Current-state map, Future-state map, Bottleneck listKanban board, WIP policies, Flow metricsCurrent Reality Tree, Core Problems, Intervention IdeasBottleneck Map, Flow Metrics, Improvement Options, Follow-up Measures
Tagsno overlap
LeanFlowWasteDelivery
FlowVisual managementDelivery
Systems thinkingRoot causeConstraintsCausality
FlowMeasurementConstraints
Add more methods