methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Value Stream Mapping workspace showing the question, observations, and next decision.
Delivery
Value Stream Mapping
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
A paper-based illustration representing C4 Model with its core stages and visible working result.
Architecture
C4 Model
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Purposedifferent
When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible.For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.The C4 Model makes a system legible across several resolution levels, from context down to code. It suits situations where different audiences need to understand the same architecture from different altitudes.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.
Complexitydifferent
MediumMediumLowMedium
Timedifferent
1-3 h1-3 h1-4 hOngoing
Participantsdifferent
4-103-81-52-12
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Current-state map, Future-state map, Bottleneck listBottleneck Map, Flow Metrics, Improvement Options, Follow-up MeasuresContext Diagram, Container Diagram, Component DiagramKanban board, WIP policies, Flow metrics
Tagsno overlap
LeanFlowWasteDelivery
FlowMeasurementConstraints
ArchitectureCommunicationVisualization
FlowVisual managementDelivery
Add more methods