Paper timeline with three dates, parallel lanes for work, signals and decisions, and labeled links.
Facilitation
Timeline
Process Mapping method illustration showing its working structure
Operations
Process Mapping
Paper illustration for Theory of Constraints.
Operations
Theory of Constraints
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Purposedifferent
When a project, incident, or change process is only remembered in fragments, Timeline brings the sequence back into a readable form. It makes turning points, precursors, and after-effects recognizable over the course of time.With a confusing workflow that has many handoffs, the method makes the actual process visible. It shows where work is passed on, delayed, or duplicated, so improvement targets the right spots.For a system that does not get faster despite effort, the method directs attention to the bottleneck. It concentrates improvement on the point that actually limits throughput.For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.
Complexitydifferent
LowMediumHighMedium
Timedifferent
30-90 min1-3 h2-4 h Analyse, laufend1-3 h
Participantsdifferent
2-123-103-123-8
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
Timeline, Milestones, Insight NotesProcess Map, Handoff List, Improvement BacklogConstraint Map, Improvement Plan, Flow MetricsBottleneck Map, Flow Metrics, Improvement Options, Follow-up Measures
Tagsno overlap
TimelineFacilitationSequence
ProcessOperationsImprovement
OperationsConstraintsFlowImprovement
FlowMeasurementConstraints