methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper timeline with three dates, parallel lanes for work, signals and decisions, and labeled links.
Facilitation
Timeline
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
Paper fishbone diagram with a measurable effect at the head and six labeled cause branches.
Operations
Fishbone Diagram
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
Purposedifferent
When a project, incident, or change process is only remembered in fragments, Timeline brings the sequence back into a readable form. It makes turning points, precursors, and after-effects recognizable over the course of time.For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.When a problem has several possible contributing factors, the method sorts causes by cause areas. It prevents an initial hunch from blocking the view of other plausible drivers.When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.
Complexitydifferent
LowHighLowLow
Timedifferent
30-90 min2-8 h30-60 min60-90 min
Participantsdifferent
2-122-82-84-10
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop
Outputdifferent
Timeline, Milestones, Insight NotesProblem Analysis, Decision Analysis, Risk PlanFishbone Diagram, Cause Categories, Investigation BacklogProblem Cluster, Prioritized Challenge, Experiment
Tagsno overlap
TimelineFacilitationSequence
Problem solvingRoot causeDecisionOperations
Root causeQualityOperations
FacilitationDecisionProblem solvingWorkshop
Add more methods