methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Time Blocking
Operations
Time Blocking
Paper illustration for Failure Mode and Effects Analysis
Operations
Failure Mode and Effects Analysis
Paper illustration for Fault Tree Analysis.
Operations
Fault Tree Analysis
Paper fishbone diagram with a measurable effect at the head and six labeled cause branches.
Operations
Fishbone Diagram
Purposedifferent
With a calendar that grows on request, the method makes available time explicit again. It combines appointments, focus work, and buffer into a more realistic day structure.For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability.For a critical top event with several possible triggers, the method logically models failure paths. It makes visible which combinations of conditions can lead to damage.When a problem has several possible contributing factors, the method sorts causes by cause areas. It prevents an initial hunch from blocking the view of other plausible drivers.
Complexitydifferent
LowHighHighLow
Timedifferent
15-30 min Planung, laufend2-6 h2-6 h30-60 min
Participantsdifferent
13-103-82-8
Formatdifferent
AsyncWorkshopWorkshop + asyncWorkshop
Outputdifferent
Blocked Calendar, Capacity View, Focus PlanFMEA Table, Risk Priority, Mitigation ActionsFault Tree, Critical Paths, Cause Hypotheses, Control ActionsFishbone Diagram, Cause Categories, Investigation Backlog
Tagsno overlap
PlanningTime managementFocus
RiskQualityOperationsRoot cause
RiskRoot causeSafety
Root causeQualityOperations
Add more methods