methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Paper illustration for NoEstimates.
Agile
NoEstimates
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Purposedifferent
A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.
Complexitydifferent
MediumHighMediumHigh
Timedifferent
10-30 min je Item45-90 minlaufend90-180 min
Participantsdifferent
1-83-102-123-8
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop
Outputdifferent
Three-Point Estimate, Risk Range, Assumption NotesRanked Backlog, Cost-of-Delay AssumptionsThroughput Data, Flow Forecast, Slicing RulesCoD Table, Prioritization Sequence
Tagsno overlap
EstimationUncertaintyForecasting
LeanEconomicsSequencePrioritization
EstimationForecastingFlow
PrioritizationDeliveryEconomicsDecision
Add more methods