methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Paper illustration for NoEstimates.
Agile
NoEstimates
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Purposedifferent
A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules.When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped.For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.
Complexitydifferent
MediumMediumLowMedium
Timedifferent
10-30 min je Itemlaufend30-90 min1-3 h
Participantsdifferent
1-82-122-83-8
Formatsame
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Three-Point Estimate, Risk Range, Assumption NotesThroughput Data, Flow Forecast, Slicing RulesConstraint List, Hard/Soft Classification, Option Impact Notes, Decision BoundariesBottleneck Map, Flow Metrics, Improvement Options, Follow-up Measures
Tagsno overlap
EstimationUncertaintyForecasting
EstimationForecastingFlow
ConstraintsDecisionPlanningOptions
FlowMeasurementConstraints
Add more methods