Criterion
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Paper illustration of a team retrospective with three separate Start, Stop, and Continue areas and a shared action list.
Agile
Start Stop Continue
Paper illustration for Mad Sad Glad
Agile
Mad Sad Glad
Purposedifferent
A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.When a team wants to deliberately adjust its working behavior, it makes habits visible and assessable. It focuses on concrete changes instead of diffuse mood.When a team's or workshop's mood needs to become readable, it structures emotional signals with little setup. It makes strain, relief, and sources of energy tangible.
Complexitydifferent
MediumMediumLowLow
Timedifferent
10-30 min je Item1-3 h30-60 min30-60 min
Participantsdifferent
1-83-83-123-10
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop
Outputdifferent
Three-Point Estimate, Risk Range, Assumption NotesBottleneck Map, Flow Metrics, Improvement Options, Follow-up MeasuresStart Stop Continue Board, Improvement ActionsEmotion Board, Themes, Action Items
Tagsno overlap
EstimationUncertaintyForecasting
FlowMeasurementConstraints
RetrospectiveImprovementTeamReflection
RetrospectiveTeamReflection
Add more methods