View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Theory of Constraints | ![]() Delivery Cost of Delay | ![]() Operations ABC Analysis | ![]() Operations Bottleneck Analysis |
|---|---|---|---|---|
Purposedifferent | For a system that does not get faster despite effort, the method directs attention to the bottleneck. It concentrates improvement on the point that actually limits throughput. | Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence. | With many similar objects of differing economic significance, the method prioritizes effort by effect. It separates what needs regular steering from what rarely needs attention. | For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput. |
Complexitydifferent | High | High | Low | Medium |
Timedifferent | 2-4 h Analyse, laufend | 90-180 min | 30-60 min | 1-3 h |
Participantsdifferent | 3-12 | 3-8 | 1-5 | 3-8 |
Formatdifferent | Workshop + async | Workshop | Async | Workshop + async |
Outputdifferent | Constraint Map, Improvement Plan, Flow Metrics | CoD Table, Prioritization Sequence | ABC Classification, Focus Rules, Control List | Bottleneck Map, Flow Metrics, Improvement Options, Follow-up Measures |
Tagsno overlap | OperationsConstraintsFlowImprovement | PrioritizationDeliveryEconomicsDecision | PrioritizationOperationsPortfolio | FlowMeasurementConstraints |



