View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Theory of Constraints | ![]() Operations Bottleneck Analysis | ![]() Operations Getting Things Done | ![]() Operations Weekly Review |
|---|---|---|---|---|
Purposedifferent | For a system that does not get faster despite effort, the method directs attention to the bottleneck. It concentrates improvement on the point that actually limits throughput. | For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput. | With many open commitments and ideas in daily life, a reliable external storage system emerges. The method relieves the mind so priority and context don't have to compete in memory. | In a week with many open loops, the method creates distance from operational noise. It organizes commitments, calendar, and projects so the next week becomes workable. |
Complexitydifferent | High | Medium | Medium | Low |
Timedifferent | 2-4 h Analyse, laufend | 1-3 h | 1-2 h Setup, laufend | 30-60 min |
Participantsdifferent | 3-12 | 3-8 | 1 | 1 |
Formatdifferent | Workshop + async | Workshop + async | Async | Async |
Outputdifferent | Constraint Map, Improvement Plan, Flow Metrics | Bottleneck Map, Flow Metrics, Improvement Options, Follow-up Measures | Action Lists, Project List, Review Routine | Updated Task System, Weekly Focus, Next Actions |
Tagsno overlap | OperationsConstraintsFlowImprovement | FlowMeasurementConstraints | ProductivityPlanningTasksExecution | ProductivityExecutionPlanning |