View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Agile Story Splitting | ![]() Operations Bottleneck Analysis | ![]() Operations Gemba Walk | ![]() Operations Theory of Constraints |
|---|---|---|---|---|
Purposedifferent | When a story becomes too large for a clean flow, it breaks scope down along value and risk. It shapes the work into a form that ships earlier and is easier to verify. | For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput. | When there is uncertainty about the real course of a process, the method brings observation to the place where work happens. It combines perception, follow-up questions, and process knowledge so decisions rest on actual workflows instead of assumptions. | For a system that does not get faster despite effort, the method directs attention to the bottleneck. It concentrates improvement on the point that actually limits throughput. |
Complexitydifferent | Medium | Medium | Low | High |
Timedifferent | 30-60 min | 1-3 h | 30-120 min | 2-4 h Analyse, laufend |
Participantsdifferent | 2-6 | 3-8 | 2-6 | 3-12 |
Formatdifferent | Workshop + async | Workshop + async | Workshop | Workshop + async |
Outputdifferent | Smaller Stories, Acceptance Criteria, Split Rationale | Bottleneck Map, Flow Metrics, Improvement Options, Follow-up Measures | Observation Notes, Improvement Ideas | Constraint Map, Improvement Plan, Flow Metrics |
Tagsno overlap | BacklogIterationDelivery | FlowMeasurementConstraints | LeanObservationProcessOperations | OperationsConstraintsFlowImprovement |



