View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Standard Work Analysis | ![]() Operations Scatter Diagram | ![]() Operations 8D Problem Solving | ![]() Operations 5 Whys |
|---|---|---|---|---|
Purposedifferent | When the same task is done differently depending on the person, the method exposes the reliable core. It creates comparability without unnecessarily choking off needed latitude. | When the question is whether two measures are related, the method makes patterns in the data picture visible. It separates felt correlations from relationships that actually show up in the data. | For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly. | For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description. |
Complexitydifferent | Medium | Low | High | Low |
Timedifferent | 1-3 h | 30-90 min | 1-6 Wochen | 15-30 min |
Participantsdifferent | 2-6 | 1-4 | 4-10 | 2-6 |
Formatdifferent | Workshop | Workshop + async | Workshop + async | Workshop |
Outputdifferent | Standard Work Sheet, Deviation List, Improved Standard, Training Needs | Scatter Plot, Korrelationsnotiz, Hypothesenliste | 8D Report, Containment Plan, Root Cause Evidence, Corrective Action Plan | Root cause notes, Countermeasures |
Tagsno overlap | LeanProcessQuality | Root causeQualityVisualization | QualityProblem solvingRoot cause | Root causeIncidentLeanProblem solving |



