methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Standard Work Analysis.
Operations
Standard Work Analysis
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Purposedifferent
When the same task is done differently depending on the person, the method exposes the reliable core. It creates comparability without unnecessarily choking off needed latitude.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.
Complexitydifferent
MediumHighLowHigh
Timedifferent
1-3 h90-180 min45-90 min45-90 min
Participantsdifferent
2-63-82-83-10
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop
Outputdifferent
Standard Work Sheet, Deviation List, Improved Standard, Training NeedsCoD Table, Prioritization SequenceAssumption List, Critical Assumptions, Learning PlanRanked Backlog, Cost-of-Delay Assumptions
Tagsno overlap
LeanProcessQuality
PrioritizationDeliveryEconomicsDecision
AssumptionsRiskDecisionDiscovery
LeanEconomicsSequencePrioritization
Add more methods