View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Product Discovery Solution Interview | ![]() Innovation Design Sprint | ![]() Innovation Brainstorming | ![]() Innovation Lotus Blossom |
|---|---|---|---|---|
Purposedifferent | When a solution idea is already on the table, it checks how it is understood and evaluated. It looks for resonance, objections, and missing fit early in the conversation. | When the product question is unclear and time pressure is high, the method takes a team from an open idea to a testable solution. It connects problem understanding, decision, and learning in one compact format, lowering the risk of spending a lot of energy on a mere guess. | When a team faces an open question with many obvious directions, the method first creates breadth instead of premature commitment. It separates idea flow from evaluation and makes lines of thought visible, creating a pool for selection and further development. | When a central question feels too large, the method breaks it into neighboring topic fields with their own depth of ideation. It holds structure and openness at the same time, so adjacent perspectives don't get lost. This grows an idea space out of a core problem. |
Complexitydifferent | Medium | High | Low | Low |
Timedifferent | 30-60 min je Interview | 4-5 Tage | 30-60 min | 45-90 min |
Participantsdifferent | 5-10 Interviews | 5-8 | 4-12 | 3-10 |
Formatdifferent | Workshop + async | Workshop | Workshop | Workshop |
Outputdifferent | Solution Feedback, Objection List, Validation Notes | Prototype, Test Findings, Decision Rationale | Idea pool, Theme clusters, Shortlist | Lotus Diagram, Idea Themes, Shortlist |
Tagsno overlap | ValidationInterviewsPrototype | Design sprintPrototypeValidationInnovation | BrainstormingIdeationCreativityWorkshopDivergence | BrainstormingIdeationCreativityDivergenceWorkshop |



