methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Software Architecture Canvas method illustration showing its working structure
Architecture
Software Architecture Canvas
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration for CATWOE Analysis.
Systems Thinking
CATWOE Analysis
Paper illustration for Risk Storming.
Architecture
Risk Storming
Purposedifferent
The Software Architecture Canvas reduces a system to the most important architecture decisions, constraints, and interfaces. It is useful when teams need a resilient overall picture quickly.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.CATWOE structures a problem from six viewpoints and prevents too narrow a view of the situation. Different experiences of the system become comparably discussable this way.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.
Complexitydifferent
LowHighMediumLow
Timedifferent
1-2 hSeveral meetings plus preparation and analysis; total effort depends on scope45-90 min60-90 min
Participantsdifferent
3-10Evaluation team, architects, and relevant stakeholders3-84-12
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Architecture Canvas, Goals, Constraints, Quality AttributesPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsCATWOE Canvas, Root Definition, Stakeholder Perspectives, ConstraintsAnnotated Diagram, Prioritized Risk List, Action Backlog
Tagsno overlap
CanvasArchitectureAlignmentWorkshop
ArchitectureQualityRiskTradeoffsStakeholders
Systems thinkingFramingStakeholders
RiskArchitectureWorkshopValidation
Add more methods