View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Facilitation Six Thinking Hats | ![]() Operations A3 Problem Solving | ![]() Operations Failure Mode and Effects Analysis | ![]() Facilitation Decision Jam |
|---|---|---|---|---|
Purposedifferent | When a topic gets stuck too quickly in the same thinking mode, Six Thinking Hats deliberately separates the perspectives. This means facts, risks, creativity, and emotional signals get worked through one after another instead of mixed together. | For a complex deviation with several people involved, the method bundles problem, analysis, and decision onto one page. It creates a shared working space where causes, countermeasures, and follow-up fit together. | For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability. | When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer. |
Complexitydifferent | Medium | Medium | High | Low |
Timedifferent | 45-90 min | 45-90 min | 2-6 h | 60-90 min |
Participantsdifferent | 4-12 | 2-5 | 3-10 | 4-10 |
Formatdifferent | Workshop | Workshop + async | Workshop | Workshop |
Outputdifferent | Perspective Notes, Decision Inputs, Action Items | A3 Report, Action Plan, Root Cause Analysis | FMEA Table, Risk Priority, Mitigation Actions | Problem Cluster, Prioritized Challenge, Experiment |
Tagsno overlap | FacilitationOptionsDecision | LeanProblem solvingCoachingOperations | RiskQualityOperationsRoot cause | FacilitationDecisionProblem solvingWorkshop |



