methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Shape Up with its method-specific working model.
Delivery
Shape Up
A paper-based illustration representing C4 Model with its core stages and visible working result.
Architecture
C4 Model
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Communication Plan
Delivery
Communication Plan
Purposedifferent
Shape Up helps clarify scope, sequence, and delivery flow. It makes work boundaries and decisions explicit and captures results as pitches, bet-table decisions, and hill charts.The C4 Model makes a system legible across several resolution levels, from context down to code. It suits situations where different audiences need to understand the same architecture from different altitudes.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.When many people need to be informed in parallel and messages would otherwise arrive unevenly or too late, a Communication Plan orders communication reliably. Channels, audiences, and cadences interlock so important information doesn't get lost.
Complexitydifferent
MediumLowMediumLow
Timedifferent
6 Wochen Cycle + 2 Wochen Cool-Down1-4 hOngoing45-90 min
Participantsdifferent
2-4 pro Pitch1-52-122-6
Formatsame
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Pitches, Bet-table decisions, Hill charts, Cooldown outcomesContext Diagram, Container Diagram, Component DiagramKanban board, WIP policies, Flow metricsCommunication Plan, Channel Matrix, Message Cadence
Tagsno overlap
PlanningDeliveryAutonomy
ArchitectureCommunicationVisualization
FlowVisual managementDelivery
CommunicationStakeholdersDeliveryPlanning
Add more methods