View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Delivery Shape Up | ![]() Operations ALPEN Method | ![]() Decision Making Constraint Analysis | ![]() Delivery Cost of Delay |
|---|---|---|---|---|
Purposedifferent | Shape Up helps clarify scope, sequence, and delivery flow. It makes work boundaries and decisions explicit and captures results as pitches, bet-table decisions, and hill charts. | With an overloaded day full of too many tasks, a realistic picture of the day emerges. The method connects estimating, deciding, and buffer thinking so planning fits available energy and time. | When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped. | Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence. |
Complexitydifferent | Medium | Low | Low | High |
Timedifferent | 6 Wochen Cycle + 2 Wochen Cool-Down | 10-20 min daily | 30-90 min | 90-180 min |
Participantsdifferent | 2-4 pro Pitch | 1 | 2-8 | 3-8 |
Formatdifferent | Workshop + async | Async | Workshop + async | Workshop |
Outputdifferent | Pitches, Bet-table decisions, Hill charts, Cooldown outcomes | Daily Plan, Time Estimates, Review Notes | Constraint List, Hard/Soft Classification, Option Impact Notes, Decision Boundaries | CoD Table, Prioritization Sequence |
Tagsno overlap | PlanningDeliveryAutonomy | PlanningTime managementProductivityOperations | ConstraintsDecisionPlanningOptions | PrioritizationDeliveryEconomicsDecision |