methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Shape-first Modeling with its method-specific working model.
Knowledge Modeling
Shape-First Modeling
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Paper board with the four ROAM fields Resolved, Owned, Accepted, and Mitigated.
Agile
ROAM Board
Paper illustration of Stakeholder Salience Model with its method-specific working model.
Facilitation
Stakeholder Salience Model
Purposedifferent
Shape-First Modeling defines data quality through shapes before implementation or integration frays at the edges. The approach fits when validation and data contracts should be part of the design from the start.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.When work needs to move between different states or columns, it makes that movement and its handoffs legible. It sorts work by value, risk, and delivery ability. The result is captured as a ROAM Board and an Owner List.When stakeholders appear to matter very differently, the Stakeholder Salience Model rates their actual priority through power, legitimacy, and urgency. It turns individual contributions into a visible selection. The result is captured as a Salience diagram and a class-based strategy.
Complexitydifferent
MediumLowLowMedium
Timedifferent
Halber Tag pro Domain Slice30 min Setup, dann laufend20-40 min initial, dann laufend60-90 min
Participantsdifferent
1-41-3 maintaining, briefing for everyone3-153-6
Formatdifferent
Workshop + asyncAsyncWorkshop + asyncWorkshop
Outputdifferent
SHACL or ShEx Shapes, Validation Reports, Data Contracts, Shape DocumentationRAID Log, Status Report SourceROAM Board, Owner ListSalience Diagram, Strategy per Class
Tagsno overlap
Knowledge graphValidationSemantic
RiskTrackingStakeholdersGovernance
RiskAgileTrackingAlignment
StakeholdersFacilitationAlignmentGovernance
Add more methods