methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Scrum with its method-specific working model.
Agile
Scrum
Paper illustration of Leverage Points with its method-specific working model.
Systems Thinking
Leverage Points
Paper illustration of Counter Metrics with its method-specific working model.
Product Strategy
Counter Metrics
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Purposedifferent
When a team needs to work in a fixed delivery rhythm, it stabilizes cadence, responsibility, and feedback loops. It makes collaboration reliable across sprint boundaries.Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy.When a headline metric could mask side effects, it adds guardrail signals against unwanted outcomes. It connects customer value, product logic, and decision priorities. The result is captured as a counter-metric list and guardrail definitions.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.
Complexitydifferent
MediumHighLowHigh
Timedifferent
1-4 Wochen je Sprint, laufendHalf day30-60 min2-4 h
Participantsdifferent
3-10 (Scrum Team)3-122-63-8
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop
Outputdifferent
Product Backlog, Sprint Backlog, Increment, Sprint GoalLeverage Map, Action StrategyCounter Metric List, Guardrail DefinitionsFuture Reality Tree, Negative Branches, Assumption List, Improved Injections
Tagsno overlap
AgileIterationCadence
Systems thinkingChangeStrategy
MetricsMeasurementStrategyExperiments
Theory of ConstraintsSystems thinkingChange
Add more methods