methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Scenario Planning method illustration showing its working structure
Business Strategy
Scenario Planning
Paper illustration for Theory of Change
Systems Thinking
Theory of Change
Paper illustration of KPI Tree with its method-specific working model.
Product Strategy
KPI Tree
A paper-based illustration representing OKRs with its core stages and visible working result.
Product Strategy
OKRs
Purposedifferent
Scenario Planning opens the view to several plausible futures instead of a single forecast. The method protects strategies from depending on too narrow an expected path.Theory of Change translates a desired impact into a traceable chain of change. It makes assumptions, intermediate goals, and measurement points visible before a program is rolled out at scale.When metrics across the organization drift apart, it arranges drivers and effects under one shared logic. It connects customer value, product logic, and decision priorities. The result is captured as a KPI tree and owner list.When strategic direction needs to become measurable, it connects ambition with checkable results. It makes goals connectable to focus and review.
Complexitydifferent
HighHighMediumMedium
Timedifferent
0.5-2 Tage2-6 h90-180 min initial, dann laufend1-2 h Setup
Participantsdifferent
4-124-123-82-20
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
Scenario Set, Strategic Implications, Robust OptionsTheory of Change Map, Assumptions, Outcome MeasuresKPI Tree, Owner ListOKR set, Measurement plan, Review cadence
Tagsno overlap
StrategyUncertaintyPlanning
ImpactOutcomesSystems thinkingStrategy
MetricsStrategyAlignmentMeasurement
GoalsAlignmentOutcomesMeasurement
Add more methods