View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Scatter Diagram | ![]() Operations Fault Tree Analysis | ![]() Operations Failure Mode and Effects Analysis | ![]() Operations 8D Problem Solving |
|---|---|---|---|---|
Purposedifferent | When the question is whether two measures are related, the method makes patterns in the data picture visible. It separates felt correlations from relationships that actually show up in the data. | For a critical top event with several possible triggers, the method logically models failure paths. It makes visible which combinations of conditions can lead to damage. | For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability. | For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly. |
Complexitydifferent | Low | High | High | High |
Timedifferent | 30-90 min | 2-6 h | 2-6 h | 1-6 Wochen |
Participantsdifferent | 1-4 | 3-8 | 3-10 | 4-10 |
Formatdifferent | Workshop + async | Workshop + async | Workshop | Workshop + async |
Outputdifferent | Scatter Plot, Korrelationsnotiz, Hypothesenliste | Fault Tree, Critical Paths, Cause Hypotheses, Control Actions | FMEA Table, Risk Priority, Mitigation Actions | 8D Report, Containment Plan, Root Cause Evidence, Corrective Action Plan |
Tags1 shared | Root causeQualityVisualization | RiskRoot causeSafety | RiskQualityOperationsRoot cause | QualityProblem solvingRoot cause |



