View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Innovation SCAMPER | ![]() Decision Making DACI | ![]() Innovation Design Charrette | ![]() Innovation Lotus Blossom |
|---|---|---|---|---|
Purposedifferent | For an existing solution under pressure to change, the method deliberately opens space for systematic variants. It directs attention to rebuilding, combining, and repurposing rather than only new basic ideas. This produces concrete evolution paths for products, offerings, or workflows. | In cross-functional decisions, responsibilities quickly blur between approval, influence, and execution. DACI arranges these roles so decision pressure, contribution, and information stay cleanly separated. | In a tightly timed design process with many participants, the method pools several lines of thinking in a short time. It brings parallel design energy without letting the discussion tip into endless coordination. This quickly produces solid directions for architecture or space. | When a central question feels too large, the method breaks it into neighboring topic fields with their own depth of ideation. It holds structure and openness at the same time, so adjacent perspectives don't get lost. This grows an idea space out of a core problem. |
Complexitydifferent | Low | Low | Medium | Low |
Timedifferent | 30-60 min | 30-60 min | Halber Tag bis mehrere Tage | 45-90 min |
Participantsdifferent | 2-10 | 2-10 | 10-50 | 3-10 |
Formatdifferent | Workshop | Workshop + async | Workshop | Workshop |
Outputdifferent | SCAMPER Idea List, Concept Shortlist, Variation Notes | DACI Matrix, Decision Owner, Decision Log | Sketches and Concepts, Consolidated Solution Sketch, Prioritized Direction | Lotus Diagram, Idea Themes, Shortlist |
Tagsno overlap | BrainstormingIdeationCreativityReframingInnovation | DecisionRolesGovernanceAlignment | BrainstormingWorkshopCollaborationIdeation | BrainstormingIdeationCreativityDivergenceWorkshop |



