View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Innovation SCAMPER | ![]() Agile 4Ls Retrospective | ![]() Innovation Reverse Brainstorming | ![]() Innovation Lotus Blossom |
|---|---|---|---|---|
Purposedifferent | For an existing solution under pressure to change, the method deliberately opens space for systematic variants. It directs attention to rebuilding, combining, and repurposing rather than only new basic ideas. This produces concrete evolution paths for products, offerings, or workflows. | When a sprint should not only be assessed but also learned from, it captures experience in clear learning categories. It records what worked, what's missing, and what should run differently next time. | For persistent errors or blockages, the method shifts the view to the opposite of the desired effect. It exposes the mechanics of failure and makes hidden causes easier to grasp. This makes improvement more concrete and the problem clearer. | When a central question feels too large, the method breaks it into neighboring topic fields with their own depth of ideation. It holds structure and openness at the same time, so adjacent perspectives don't get lost. This grows an idea space out of a core problem. |
Complexitysame | Low | Low | Low | Low |
Timedifferent | 30-60 min | 45–75 min | 30-60 min | 45-90 min |
Participantsdifferent | 2-10 | Team members involved | 3-12 | 3-10 |
Formatsame | Workshop | Workshop | Workshop | Workshop |
Outputdifferent | SCAMPER Idea List, Concept Shortlist, Variation Notes | 4Ls Board, Learning Themes, Improvement Actions | Reverse Ideas, Risk Themes, Solution Ideas | Lotus Diagram, Idea Themes, Shortlist |
Tagsno overlap | BrainstormingIdeationCreativityReframingInnovation | RetrospectiveLearningReflectionTeam | BrainstormingIdeationCreativityRisk | BrainstormingIdeationCreativityDivergenceWorkshop |



