methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Risk Storming.
Architecture
Risk Storming
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Purposedifferent
Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.
Complexitydifferent
LowHighMediumHigh
Timedifferent
60-90 min45-90 min2–4 h review as a planning range; preparation and evaluation additional90-180 min
Participantsdifferent
4-123-10Designers, developers as users, and facilitation3-8
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop
Outputdifferent
Annotated Diagram, Prioritized Risk List, Action BacklogRanked Backlog, Cost-of-Delay AssumptionsPrioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisionsCoD Table, Prioritization Sequence
Tagsno overlap
RiskArchitectureWorkshopValidation
LeanEconomicsSequencePrioritization
ArchitectureEngineeringFeedbackValidationTasks
PrioritizationDeliveryEconomicsDecision
Add more methods