methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Risk Storming.
Architecture
Risk Storming
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Paper illustration for Golden Path
Engineering
Golden Path
A paper-based illustration representing arc42 with its core stages and visible working result.
Architecture
arc42
Purposedifferent
Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.When teams need a reliable default path for frequent use, sprawl quickly emerges without any guiding logic. Golden Path bundles the preferred path so good practice becomes easy and deviation becomes deliberate.arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes.
Complexitydifferent
LowLowMediumLow
Timedifferent
60-90 min15-45 min1-3 Tage Setup, laufend1-2 Tage
Participantsdifferent
4-121-32-81-4
Formatdifferent
WorkshopAsyncWorkshop + asyncWorkshop + async
Outputdifferent
Annotated Diagram, Prioritized Risk List, Action BacklogADR File, Decision Log, RationaleGolden Path Guide, Templates, Quality ChecksArchitecture Document, Context View, Runtime View, Deployment View
Tagsno overlap
RiskArchitectureWorkshopValidation
ArchitectureRationaleDocumentationGovernance
EngineeringProductivityGovernance
ArchitectureDocumentationCommunication
Add more methods