methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Risk Storming.
Architecture
Risk Storming
A3 Problem-Solving workspace showing the question, observations, and next decision.
Operations
A3 Problem Solving
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Paper illustration for 8D Problem Solving.
Operations
8D Problem Solving
Purposedifferent
Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.For a complex deviation with several people involved, the method bundles problem, analysis, and decision onto one page. It creates a shared working space where causes, countermeasures, and follow-up fit together.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly.
Complexitydifferent
LowMediumLowHigh
Timedifferent
60-90 min45-90 min15-30 min1-6 Wochen
Participantsdifferent
4-122-52-64-10
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Annotated Diagram, Prioritized Risk List, Action BacklogA3 Report, Action Plan, Root Cause AnalysisRoot cause notes, Countermeasures8D Report, Containment Plan, Root Cause Evidence, Corrective Action Plan
Tagsno overlap
RiskArchitectureWorkshopValidation
LeanProblem solvingCoachingOperations
Root causeIncidentLeanProblem solving
QualityProblem solvingRoot cause
Add more methods