View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
Purposedifferent
When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped.
Complexitydifferent
LowHighLowLow
Timedifferent
30-60 min45-90 min20–45 min30-90 min
Participantsdifferent
3-103-10Small cross-functional group2-8
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop + async
Outputdifferent
Risk Matrix, Top Risk ListRanked Backlog, Cost-of-Delay AssumptionsRisk list, Mitigation plan, Assumption logConstraint List, Hard/Soft Classification, Option Impact Notes, Decision Boundaries
Tagsno overlap
RiskDecisionPrioritizationAssessment
LeanEconomicsSequencePrioritization
RiskDecisionFailurePlanning
ConstraintsDecisionPlanningOptions
Add more methods