View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Risk Matrix | ![]() Architecture Request for Comments | ![]() Architecture arc42 | ![]() Decision Making Assumption Surfacing |
|---|---|---|---|---|
Purposedifferent | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. | An RFC clarifies architecture context, options, and consequences. It structures technical context, alternatives, tradeoffs, open questions, and review feedback, and captures the result as an RFC document, reviewer comments, and a decision rationale. | arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. |
Complexitydifferent | Low | Medium | Low | Low |
Timedifferent | 30-60 min | 1-3 Wochen vom Draft bis zur Entscheidung | 1-2 Tage | 45-90 min |
Participantsdifferent | 3-10 | 3-20 Reviewer | 1-4 | 2-8 |
Formatdifferent | Workshop + async | Async | Workshop + async | Workshop + async |
Outputdifferent | Risk Matrix, Top Risk List | RFC document, Reviewer comments, Decision rationale, Follow-up ADR or tickets | Architecture Document, Context View, Runtime View, Deployment View | Assumption List, Critical Assumptions, Learning Plan |
Tagsno overlap | RiskDecisionPrioritizationAssessment | ArchitectureDecisionAsyncGovernance | ArchitectureDocumentationCommunication | AssumptionsRiskDecisionDiscovery |



