View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Risk Matrix | ![]() Decision Making Pre-Mortem | ![]() Architecture Request for Comments | ![]() Decision Making Constraint Analysis |
|---|---|---|---|---|
Purposedifferent | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. | An RFC clarifies architecture context, options, and consequences. It structures technical context, alternatives, tradeoffs, open questions, and review feedback, and captures the result as an RFC document, reviewer comments, and a decision rationale. | When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped. |
Complexitydifferent | Low | Low | Medium | Low |
Timedifferent | 30-60 min | 20–45 min | 1-3 Wochen vom Draft bis zur Entscheidung | 30-90 min |
Participantsdifferent | 3-10 | Small cross-functional group | 3-20 Reviewer | 2-8 |
Formatdifferent | Workshop + async | Workshop | Async | Workshop + async |
Outputdifferent | Risk Matrix, Top Risk List | Risk list, Mitigation plan, Assumption log | RFC document, Reviewer comments, Decision rationale, Follow-up ADR or tickets | Constraint List, Hard/Soft Classification, Option Impact Notes, Decision Boundaries |
Tags1 shared | RiskDecisionPrioritizationAssessment | RiskDecisionFailurePlanning | ArchitectureDecisionAsyncGovernance | ConstraintsDecisionPlanningOptions |



