methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Paper illustration for 8D Problem Solving.
Operations
8D Problem Solving
Purposedifferent
When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly.
Complexitydifferent
LowHighLowHigh
Timedifferent
30-60 min2-8 h15-30 min1-6 Wochen
Participantsdifferent
3-102-82-64-10
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Risk Matrix, Top Risk ListProblem Analysis, Decision Analysis, Risk PlanRoot cause notes, Countermeasures8D Report, Containment Plan, Root Cause Evidence, Corrective Action Plan
Tagsno overlap
RiskDecisionPrioritizationAssessment
Problem solvingRoot causeDecisionOperations
Root causeIncidentLeanProblem solving
QualityProblem solvingRoot cause
Add more methods