View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Risk Matrix | ![]() Engineering Failure Scenario Analysis | ![]() Product Discovery Assumption Mapping | ![]() Product Discovery Riskiest Assumption Test |
|---|---|---|---|---|
Purposedifferent | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. | In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage. | When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first. | When an idea hinges on one critical unknown, it prioritizes testing that exact piece of uncertainty first. It separates problem, assumption, solution, and evidence. The result is captured as a prioritized list of assumptions, a test plan, and a result report. |
Complexitydifferent | Low | Medium | Medium | Medium |
Timedifferent | 30-60 min | 1-3 h | 45-60 min | 1-2 Wochen pro Iteration |
Participantsdifferent | 3-10 | 3-8 | 2-8 | 2-6 |
Formatdifferent | Workshop + async | Workshop | Workshop + async | Workshop + async |
Outputdifferent | Risk Matrix, Top Risk List | Failure Scenarios, Risk Notes, Control Gaps, Test and Response Actions | Assumption map, Test backlog, Risk ranking | Prioritized Assumption List, Test Plan, Results Report |
Tagsno overlap | RiskDecisionPrioritizationAssessment | FailureResilienceRisk | AssumptionsRiskExperimentsValidation | ExperimentsValidationDiscoveryAssumptions |



