View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Risk Matrix | ![]() Decision Making Assumption Surfacing | ![]() Architecture Software Architecture Canvas | ![]() Product Discovery Assumption Mapping |
|---|---|---|---|---|
Purposedifferent | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. | The Software Architecture Canvas reduces a system to the most important architecture decisions, constraints, and interfaces. It is useful when teams need a resilient overall picture quickly. | When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first. |
Complexitydifferent | Low | Low | Low | Medium |
Timedifferent | 30-60 min | 45-90 min | 1-2 h | 45-60 min |
Participantsdifferent | 3-10 | 2-8 | 3-10 | 2-8 |
Formatdifferent | Workshop + async | Workshop + async | Workshop | Workshop + async |
Outputdifferent | Risk Matrix, Top Risk List | Assumption List, Critical Assumptions, Learning Plan | Architecture Canvas, Goals, Constraints, Quality Attributes | Assumption map, Test backlog, Risk ranking |
Tagsno overlap | RiskDecisionPrioritizationAssessment | AssumptionsRiskDecisionDiscovery | CanvasArchitectureAlignmentWorkshop | AssumptionsRiskExperimentsValidation |



