methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Paper illustration for Dot Estimation.
Facilitation
Dot Estimation
A/B Testing workspace showing the question, observations, and next decision.
Growth
A/B Testing
Purposedifferent
When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets.When two variants compete, discussions quickly decide by taste rather than effect. A/B Testing checks behavior under controlled conditions and separates real improvement from chance or expectation effects.
Complexitydifferent
LowMediumLowHigh
Timedifferent
30-60 min45-60 min5-20 min1-4 Wochen
Participantsdifferent
3-102-83-201-6
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopAsync
Outputdifferent
Risk Matrix, Top Risk ListAssumption map, Test backlog, Risk rankingEffort Heatmap, Risk Signals, Discussion TargetsExperiment results, Decision log, Learning summary
Tagsno overlap
RiskDecisionPrioritizationAssessment
AssumptionsRiskExperimentsValidation
EstimationEffortRisk
ExperimentsGrowthAnalyticsValidation
Add more methods